- 49644EP Construction works: 1. "Rehabilitation, by CIPP" technology, on the f400 concrete canal along Kaymakchalan Street from an existing inspection shaft at the intersection with "Zhivko Nikolov" Street to an existing inspection shaft at "Sitnyakovo" Blvd. Poduyane Quarter, SO - Slatina District 2. "Rehabilitation, by CIPP" technology, on the 4004 Kamenin street along Hristo Smirnenski Blvd., from an existing inspection shaft at the intersection with ul. "Malusha" to an existing inspection shaft at the intersection with "Universitetska" Str., Sofia - Lozenets District "
8491 ПК.pdf
Publish Date:
49644ЕР Протокол ЗЗЛД.pdf
Publish Date:
49644ЕР Обява.pdf
Publish Date:
49644ЕР Документация.docx
Publish Date:
49644ЕР КСС.xls
Publish Date:
- 01
- 02